Inspection is staged, not just final: cutting, stitching and assembly are each checked in-line, and every order closes with a final AQL inspection. Before balance payment you receive a photo and measurement report of the actual shipment, and third-party inspectors are welcome.
The five checks that prevent most claims
- Bar-tacks at handles, D-rings, buckle anchors and loaded webbing ends.
- Zip and buckle cycle testing beyond 5,000 operations on the critical closures.
- Static load tests on packs - loaded to working weight and hung for 24 hours.
- Measurement checks across the full size run against the approved sample, in writing.
- Colourfastness and DWR checks on the shell, especially camouflage prints.

What you receive, in writing
- Photo report of the finished goods before balance payment.
- Measurement report across the size run.
- Third-party inspection reports, if you send an inspector - access is standard, not a favour.


Note: the same inspection standard runs across every line - carriers, vests, packs, pouches and pet gear share the floor and the QC procedure.